Contractors--Subcontracted Work--In Connection with Building Construction, Reconstruction, Repair or Erection--Apartment or Office Buildings over Four Stories

Forms written for this kind of business. Core coverage forms and general endorsements apply to every account and are not listed here.

Commercial General Liability (ISO CG)

51 forms
Form CodeTitleTypeWho needs it
CG 00 09Owners And Contractors Protective Liability Coverage Form – Coverage For Operations Of Designated ContractorCoverageProject owners, public entities, railroads and general contractors that require a contractor to buy an OCP policy naming them for a specific project.
CG 00 35Railroad Protective Liability Coverage FormCoverageContractors working on, over, under or adjacent to railroad property under a railroad right-of-entry or construction agreement.
CG 04 37Loss Of Electronic Data Resulting From Physical Injury To Tangible Property Liability Coverage – Subject To Cyber Incident ExclusionEndorsementContractors, IT installers, utilities and manufacturers whose physical damage to equipment can destroy third parties' data.
CG 20 07Additional Insured – Engineers, Architects Or SurveyorsEndorsementContractors and developers that hire architects, engineers or surveyors who require additional insured status on the contractor's CGL.
CG 20 10Additional Insured – Owners, Lessees Or Contractors – Scheduled Person Or OrganizationEndorsementContractors and subcontractors whose construction contracts require them to name an owner, lessee or upstream contractor as additional insured for ongoing work.
CG 20 12Additional Insured – State Or Governmental Agency Or Subdivision Or Political Subdivision – Permits Or AuthorizationsEndorsementContractors, event organizers, utilities and others that need a municipal permit (street opening, right-of-way, special event) requiring the permitting authority to be named as additional insured.
CG 20 28Additional Insured – Lessor Of Leased EquipmentEndorsementContractors, manufacturers and other businesses that lease or rent equipment (cranes, lifts, forklifts, machinery) under agreements requiring the lessor to be an additional insured.
CG 20 31Additional Insured – Engineers, Architects Or Surveyors (OCP Coverage Part)EndorsementProject owners, developers and contractors buying Owners and Contractors Protective (OCP) policies whose design professionals require additional insured status.
CG 20 32Additional Insured – Engineers, Architects Or Surveyors Not Engaged By The Named InsuredEndorsementSubcontractors and contractors whose contracts require them to cover the project owner's architect, engineer or surveyor.
CG 20 33Additional Insured – Owners, Lessees Or Contractors – Automatic Status When Required In A Written Construction Agreement With YouEndorsementContractors and subcontractors with many construction contracts that each require additional insured status for the party they work for.
CG 20 34Additional Insured – Lessor Of Leased Equipment – Automatic Status When Required In Lease Agreement With YouEndorsementContractors and other businesses that frequently rent or lease equipment from different lessors.
CG 20 37Additional Insured – Owners, Lessees Or Contractors – Completed OperationsEndorsementContractors whose contracts require completed operations additional insured status for a scheduled owner or upstream contractor.
CG 20 38Additional Insured – Owners, Lessees Or Contractors – Automatic Status For Other Parties When Required In Written Construction AgreementEndorsementSubcontractors whose subcontracts require them to cover the general contractor and also the owner, lender or other upstream parties.
CG 20 39Additional Insured – Owners, Lessees Or Contractors – Automatic Status When Required In Written Construction Agreement With You (Completed Operations)EndorsementContractors with many construction contracts that require completed operations additional insured status for the party they contract with.
CG 20 40Additional Insured – Owners, Lessees Or Contractors – Automatic Status For Other Parties When Required In Written Construction Agreement (Completed Operations)EndorsementSubcontractors whose contracts require completed operations additional insured status for the general contractor, owner and other upstream parties.
CG 20 41Additional Insured – Owners, Lessees Or Contractors – Completed Operations Subject To The General AggregateEndorsementContractors that need a single scheduled endorsement giving an owner or contractor both ongoing and completed operations additional insured status.
CG 21 31Limited Exclusion – Designated Operations Covered By A Controlled (Wrap-Up) Insurance ProgramExclusionContractors enrolled in OCIP/CCIP programs who want their own CGL to respond if the wrap-up coverage ends early.
CG 21 34Exclusion – Designated WorkExclusionContractors with a specific type of completed work the carrier will not insure (for example residential, condominium, EIFS, roofing or foundation work).
CG 21 39Contractual Liability LimitationExclusionAccounts where the carrier will not insure assumed liability under service, construction or vendor indemnity agreements.
CG 21 44Limitation Of Coverage To Designated Premises, Project Or OperationExclusionAccounts written for a single location, project or described operation, such as single-project contractors, special events, and businesses the underwriter wants to confine to their declared class.
CG 21 53Exclusion – Designated Ongoing OperationsExclusionContractors and service businesses with one hazardous operation (for example roofing, blasting, crane work, residential work) that the underwriter will not cover.
CG 21 54Exclusion – Designated Operations Covered By A Controlled (Wrap-Up) Insurance ProgramExclusionContractors that enroll in owner- or contractor-controlled insurance programs on specific projects.
CG 21 96Silica Or Silica-Related Dust ExclusionExclusionContractors and manufacturers that cut, grind, blast or process concrete, stone, sand, glass or engineered stone.
CG 22 34Exclusion – Construction Management Errors And OmissionsExclusionConstruction managers and general contractors acting as construction manager.
CG 22 79Exclusion – Contractors – Professional LiabilityExclusionDesign-build contractors and contractors that provide or subcontract engineering, architectural or surveying services.
CG 22 80Limited Exclusion – Contractors – Professional LiabilityExclusionContractors with some in-house design capability whose carrier will not cover professional services rendered as a design professional.
CG 22 94Exclusion – Damage To Work Performed By Subcontractors On Your BehalfExclusionGeneral contractors, homebuilders and developers where the carrier wants to remove construction defect coverage for the contractor's own project.
CG 22 95Exclusion – Damage To Work Performed By Subcontractors On Your Behalf – Designated Sites Or OperationsExclusionGeneral contractors and builders where the carrier wants to remove construction defect coverage for particular projects or types of work.
CG 24 17Contractual Liability – RailroadsEndorsementContractors working on or near railroad property under railroad right-of-entry or construction agreements that require the contractor to indemnify the railroad.
CG 24 27Limited Contractual Liability – RailroadsEndorsementContractors working for or near railroads whose carriers will extend railroad contractual coverage only on an intermediate-form basis.
CG 25 03Designated Construction Project(s) General Aggregate LimitEndorsementContractors whose contracts require a per project aggregate, or that work several large jobs a year and don't want one project to exhaust the general aggregate.
CG 25 45Designated Project(s) Products-Completed Operations Aggregate LimitEndorsementContractors whose contracts require completed operations limits to apply per project.
CG 25 47Designated Project(s) Aggregate Limit (Products/Completed Operations Coverage Part)EndorsementContractors buying a stand-alone ISO Products/Completed Operations policy (CG 00 37/00 38) who need per project completed operations aggregates.
CG 28 04Earlier Notice Of Cancellation Provided By Us (OCP Coverage Part)EndorsementOwners and Contractors Protective (OCP) policies issued for projects whose owners require longer cancellation notice.
CG 29 35Additional Insured – State Or Governmental Agency Or Subdivision Or Political Subdivision – Permits Or Authorizations (OCP Coverage Part)EndorsementOwners or contractors carrying an OCP policy for a project that requires a governmental permit naming the authority as additional insured.
CG 29 88Waiver Of Transfer Of Rights Of Recovery Against Others To Us (Waiver Of Subrogation) – OCP Coverage PartEndorsementBuyers of Owners and Contractors Protective (OCP) policies whose project contracts require a waiver of subrogation.
CG 31 31Fungi Or Bacteria Exclusion (OCP And Products/Completed Operations Coverage Parts)ExclusionOCP and stand-alone products/completed operations policies for construction and building-related risks.
CG 31 32Limited Fungi Or Bacteria Coverage (OCP And Products/Completed Operations Coverage Parts)EndorsementOCP and products/completed operations policyholders that need some mold or bacteria coverage back.
CG 33 91Texas Additional Insured – Engineers, Architects Or SurveyorsEndorsementTexas contractors that must add architects, engineers or surveyors they engage as additional insureds.
CG 34 24Exclusion – Designated Operations Covered By A Controlled (Wrap-Up) Insurance Program (Other Coverage Parts)ExclusionContractors in wrap-up programs whose OCP or products/completed operations policies also need the wrap-up exclusion.
CG 34 32Total Pollution Exclusion (OCP Coverage Part)ExclusionOCP policies for projects with pollution exposure.
CG 34 46Cannabis Exclusion (OCP Coverage Part)ExclusionOCP policies for projects connected with the cannabis industry (grow facilities, dispensary build-outs).
CG 34 47Cannabis Exclusion With Hemp Exception (OCP Coverage Part)ExclusionOCP policies for projects connected with hemp or cannabis businesses.
CG 40 04Exclusion – Earth MovementExclusionContractors with earthwork, foundation, excavation, grading, landscaping or site development operations in areas prone to subsidence or landslide.
CG 40 05Exclusion – Earth Movement – Completed OperationsExclusionContractors whose completed work could be damaged or cause damage through soil movement.
CG 40 06Earth Movement – Exclusion For Designated Operation(s) Or Project(s)ExclusionContractors with a particular project or operation carrying elevated earth movement exposure.
CG 40 07Exclusion – Designated Operations Covered By A Controlled (Wrap-Up) Insurance Program – Limited Exception For Additional InsuredsExclusionContractors enrolled in wrap-up programs whose contracts also require them to provide additional insured coverage on their own CGL.
CG 40 08Limited Exclusion – Designated Operations Covered By A Controlled (Wrap-Up) Insurance Program – Limited Exception For Additional InsuredsExclusionContractors in wrap-up programs that need the most protective ISO wrap-up exclusion.
CG 40 27Exclusion – Exterior Insulation And Finish Systems (EIFS) With Exception For Drainable EIFS Not Installed Over WoodExclusionStucco, plaster and exterior cladding contractors, general contractors and building product suppliers working with EIFS.
CG 40 34Exclusion – Exterior Insulation And Finish Systems (EIFS) With Exception For Drainable EIFS Not Over Wood – Subject To Aggregate LimitExclusionEIFS, stucco and cladding contractors and suppliers.
CG DS 02Owners And Contractors Protective Liability DeclarationsDeclarationOwners, public entities and contractors purchasing OCP policies for a project.