CG 40 06 12 19 is Earth Movement – Exclusion For Designated Operation(s) Or Project(s). It applies the earth movement exclusion only to scheduled operations or projects.
Who needs it
Hillside, landslide-zone or expansive-soil projects, or a contractor's grading and excavation operations.
Key provisions and limits
- Operations or projects are scheduled.
Quoting and selling notes
- Narrower than CG 40 04; push for this version when an underwriter insists on an earth movement exclusion.
- Ask about soil reports, geotechnical engineering, retaining wall and grading work, and the share of residential versus commercial projects; underwriters in hillside and expansive-soil regions use these answers to decide between the broad and designated versions.