What it does

CG 40 06 12 19 is Earth Movement – Exclusion For Designated Operation(s) Or Project(s). It applies the earth movement exclusion only to scheduled operations or projects.

Who needs it

Hillside, landslide-zone or expansive-soil projects, or a contractor's grading and excavation operations.

Key provisions and limits

  • Operations or projects are scheduled.

Quoting and selling notes

  • Narrower than CG 40 04; push for this version when an underwriter insists on an earth movement exclusion.
  • Ask about soil reports, geotechnical engineering, retaining wall and grading work, and the share of residential versus commercial projects; underwriters in hillside and expansive-soil regions use these answers to decide between the broad and designated versions.

Related forms

CG 40 04, CG 40 05.